Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Central valley project unit bids opened. Kennett dam site approved by U.S
Report on preparatory work for construction of great irrigation and power development project estimated to cost $170,000,000 and including two high dams, long canals, etc.
Central valley project unit bids opened. Kennett dam site approved by U.S
Report on preparatory work for construction of great irrigation and power development project estimated to cost $170,000,000 and including two high dams, long canals, etc.
Central valley project unit bids opened. Kennett dam site approved by U.S
Calif Highways Pub Works
Kelly, E.L. (Autor:in)
1937
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bids called for shasta dam -- Central valley project
Engineering Index Backfile | 1938
Bids called for shasta dam -- Central valley project
Engineering Index Backfile | 1938
Bids on big san Gabriel dam, $25,000,000 flood control project to be opened July 11
Engineering Index Backfile | 1927
Engineering Index Backfile | 1945