Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction cost and man-hour summary of insulated steel house of Purdue Housing research project; productivity of labor; cubic unit costs; progress; breakdown of labor costs; breakdown of material cost; heating; plumbing; electrical work; painting.
Construction cost and man-hour summary of insulated steel house of Purdue Housing research project; productivity of labor; cubic unit costs; progress; breakdown of labor costs; breakdown of material cost; heating; plumbing; electrical work; painting.
Cost analysis of $5,000 steel house
Construction Methods Equipment
Ulmer, C.P. (Autor:in)
1937
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Figure Ground Comparisons (1:5,000)
Wiley | 2023
|Engineering Index Backfile | 1942
Test of a 5,000 kw. alternator
Engineering Index Backfile | 1905
|Rolling electrification - a 5,000 track km programme?
IuD Bahn | 2009
|A Swiss 5,000-volt single-phase road
Engineering Index Backfile | 1911
|