Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
5,000 houses in 5 months
Near important war center 5000 prefabricated and partly pre-assembled demountable houses are being built in five months time to relieve critical housing shortage; standard design is one-story 24-ft, 3-in. × 28-ft house with two bedrooms, living room, large kitchen and bath; houses require 168 manhours of labor in fabricating yard and 150 man hours for assembly.
5,000 houses in 5 months
Near important war center 5000 prefabricated and partly pre-assembled demountable houses are being built in five months time to relieve critical housing shortage; standard design is one-story 24-ft, 3-in. × 28-ft house with two bedrooms, living room, large kitchen and bath; houses require 168 manhours of labor in fabricating yard and 150 man hours for assembly.
5,000 houses in 5 months
Eng News-Rec
Engineering News-Record ; 129
1942
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Figure Ground Comparisons (1:5,000)
Wiley | 2023
|Test of a 5,000 kw. alternator
Engineering Index Backfile | 1905
|Cost analysis of $5,000 steel house
Engineering Index Backfile | 1937
|A Swiss 5,000-volt single-phase road
Engineering Index Backfile | 1911
|Rolling electrification - a 5,000 track km programme?
IuD Bahn | 2009
|