Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Diverting Columbia at Grand Coulee with timber cribs and gravel fills
Description of two cross-river cofferdams constructed to permit unwatering and excavating in main channel area; crib bottoms designed from 40,000 soundings taken in river channel; main cribs are 64 × 90 ft; cofferdam construction; design of large crib bottoms; equipment and materials.
Diverting Columbia at Grand Coulee with timber cribs and gravel fills
Description of two cross-river cofferdams constructed to permit unwatering and excavating in main channel area; crib bottoms designed from 40,000 soundings taken in river channel; main cribs are 64 × 90 ft; cofferdam construction; design of large crib bottoms; equipment and materials.
Diverting Columbia at Grand Coulee with timber cribs and gravel fills
Western Construction News
1936
4 pages
Bibliography
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Diversion of Columbia river -- Grand Coulee Dam
Engineering Index Backfile | 1937
|Grand Coulee -- Key to Columbia river power
Engineering Index Backfile | 1934
Stabilizing Earthen Dams Built Over Timber Cribs
British Library Conference Proceedings | 1994
|Concrete placing at Grand Coulee -- From gravel pit to farms
Engineering Index Backfile | 1939
Engineering Index Backfile | 1938