Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete placing at Grand Coulee -- From gravel pit to farms
Progress report on construction of dam; concrete placing going forward at rate of about 12,000 cu yd every 24 hr; typical mass concrete mixes showing changes in proportioning to meet variation in production of aggregates; mixing plants; remote control on concrete train; concrete handling and placing; operations on trestle.
Concrete placing at Grand Coulee -- From gravel pit to farms
Progress report on construction of dam; concrete placing going forward at rate of about 12,000 cu yd every 24 hr; typical mass concrete mixes showing changes in proportioning to meet variation in production of aggregates; mixing plants; remote control on concrete train; concrete handling and placing; operations on trestle.
Concrete placing at Grand Coulee -- From gravel pit to farms
Western Construction News
1939
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete mixing and placing at grand coulee dam
Engineering Index Backfile | 1936
Erecting 3600-ft steel trestle for placing Grand Coulee concrete
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1941
|Diverting Columbia at Grand Coulee with timber cribs and gravel fills
Engineering Index Backfile | 1936
Engineering Index Backfile | 1938