Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Report on construction work of taiyoga bridge in Manchoukuo
Construction of highway plate girder bridge, 325.7 m total length, max span 36 m; construction of piers by pneumatic caisson process.
Report on construction work of taiyoga bridge in Manchoukuo
Construction of highway plate girder bridge, 325.7 m total length, max span 36 m; construction of piers by pneumatic caisson process.
Report on construction work of taiyoga bridge in Manchoukuo
Doboku-Gakkai-Si (Civ Eng Soc -- J)
Kawasaki, M. (Autor:in)
1937
13 pages
Aufsatz (Zeitschrift)
Japanisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Report of construction work of Dai-iti Tadamigawa-bridge
Engineering Index Backfile | 1939
|Handling practical bridge construction work
Engineering Index Backfile | 1916
On construction work of teigan bridge
Engineering Index Backfile | 1935
|Bridge work carriage and pipeline construction method
Europäisches Patentamt | 2020
|