Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of single span steel truss bridge having clear span of 112 m, total length 176 m. (Civ Eng Soc, Japan -- J)
Report of construction work of Dai-iti Tadamigawa-bridge
Doboku-Gakkai-Si
Oisi, S. (Autor:in)
Doboku-Gakkai-Si ; 25
1939
17 pages
Aufsatz (Zeitschrift)
Japanisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Report on construction work of taiyoga bridge in Manchoukuo
Engineering Index Backfile | 1937
|Handling practical bridge construction work
Engineering Index Backfile | 1916
On construction work of teigan bridge
Engineering Index Backfile | 1935
|Bridge work carriage and pipeline construction method
Europäisches Patentamt | 2020
|