Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bored-pile pier foundation of Hochstrasser-Weise system using suction-drilling method
Construction of 640 m long, 24.7 m wide pier founded on 672 cylindrical piles, each 26.5 m long, 92 to 100 cm in diam; techniques of sinking-in of drill pipe into sea bottom by means of pneumatic oscillator combined with suction system, introducing reinforcement, filling with pressed concrete, and pulling-out drill pipe, are described.
Bored-pile pier foundation of Hochstrasser-Weise system using suction-drilling method
Construction of 640 m long, 24.7 m wide pier founded on 672 cylindrical piles, each 26.5 m long, 92 to 100 cm in diam; techniques of sinking-in of drill pipe into sea bottom by means of pneumatic oscillator combined with suction system, introducing reinforcement, filling with pressed concrete, and pulling-out drill pipe, are described.
Bored-pile pier foundation of Hochstrasser-Weise system using suction-drilling method
Bohrpfahlgruendung einer Kaiplatte nach dem System Hochstrasser-Weise unter Verwendung des Saugbohr-Verfahrens
Heitz, O.H. (Autor:in)
Bautechnik ; 41
1964
5 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
"Hochstrasser-Weise"system of bored and pressure grouted piles
Engineering Index Backfile | 1961
|Construction method for bored pile foundation, combined steel casing and bored pile foundation
Europäisches Patentamt | 2023
|Engineering Index Backfile | 1952
Europäisches Patentamt | 2024
|