Under water
Description of the successful construction of a pier by using concrete in situ. under 20 ft. of water. Concrete lowered in a box 20 cubic ft. capacity and directed by diver. This method found cheaper than that of using set blocks of concrete. (See also Eng. Rec. Oct. 22 1892, p. 323)
Under water
Description of the successful construction of a pier by using concrete in situ. under 20 ft. of water. Concrete lowered in a box 20 cubic ft. capacity and directed by diver. This method found cheaper than that of using set blocks of concrete. (See also Eng. Rec. Oct. 22 1892, p. 323)
Under water
Lon Eng
1892
2 pages
Aufsatz (Zeitschrift)
Englisch