A platform for research: civil engineering, architecture and urbanism
Under water
Description of the successful construction of a pier by using concrete in situ. under 20 ft. of water. Concrete lowered in a box 20 cubic ft. capacity and directed by diver. This method found cheaper than that of using set blocks of concrete. (See also Eng. Rec. Oct. 22 1892, p. 323)
Under water
Description of the successful construction of a pier by using concrete in situ. under 20 ft. of water. Concrete lowered in a box 20 cubic ft. capacity and directed by diver. This method found cheaper than that of using set blocks of concrete. (See also Eng. Rec. Oct. 22 1892, p. 323)
Under water
Lon Eng
1892
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
ASCE | 2021
|Engineering Index Backfile | 1961
British Library Conference Proceedings | 1996
|Online Contents | 2014
|