Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Aboveground pipeline sections of Kokelumne aqueduct
Aqueduct consists of 9 mi of concrete lined tunnels, 3 1/2 mi of cast-in-place concrete pipe and 81 mi of parallel twin lines of steel and of reinforced concrete pipe; diameter of new line varies from 54 to 68 in.; data on foundation of pipe line, expansion joints, steel supports, concrete bent supports and pipe tests.
Aboveground pipeline sections of Kokelumne aqueduct
Aqueduct consists of 9 mi of concrete lined tunnels, 3 1/2 mi of cast-in-place concrete pipe and 81 mi of parallel twin lines of steel and of reinforced concrete pipe; diameter of new line varies from 54 to 68 in.; data on foundation of pipe line, expansion joints, steel supports, concrete bent supports and pipe tests.
Aboveground pipeline sections of Kokelumne aqueduct
Am Water Works Assn -- J
Trahern, J.W. (Autor:in)
1950
10 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Aboveground Pipeline Sections of Mokelumne Aqueduct
Wiley | 1950
|Aqueduct structure and construction method for reinforcing partial aqueduct sections
Europäisches Patentamt | 2024
|Fabricated arched aqueduct support, aqueduct and construction method of aqueduct support
Europäisches Patentamt | 2024
|Curves on Winnipeg aqueduct built with straight sections of forms
Engineering Index Backfile | 1915
Aqueduct structure and aqueduct underwater cutting method
Europäisches Patentamt | 2024
|