Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction materials by airlift
Location of rock fill dam on headwaters of Capilano River, source of water supply for Vancouver, BC, did not allow construction of access road; helicopter having lifting capacity of 400 lb used to transport total of 340,000 tons to dam site; delivery cost per lb $10. 85 in Oct-Nov 1948 and $5.5 in July-Oct 1949.
Construction materials by airlift
Location of rock fill dam on headwaters of Capilano River, source of water supply for Vancouver, BC, did not allow construction of access road; helicopter having lifting capacity of 400 lb used to transport total of 340,000 tons to dam site; delivery cost per lb $10. 85 in Oct-Nov 1948 and $5.5 in July-Oct 1949.
Construction materials by airlift
Eng News-Rec
Engineering News-Record ; 144
1950
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Disposable Flat Panel Airlift Photobioreactors
Wiley | 2013
|Airlift airfield gets heavy concrete runway
Engineering Index Backfile | 1950
|