Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concreting the Adams tunnel
Illustrated description of concrete lining project for Alva B. Adams tunnel, carrying irrigation water from Colorado River to North Platte river valley; use of collapsible forms, exterior batching and "Pumpcrete" mechanical placing is cited as means to speed work.
Concreting the Adams tunnel
Illustrated description of concrete lining project for Alva B. Adams tunnel, carrying irrigation water from Colorado River to North Platte river valley; use of collapsible forms, exterior batching and "Pumpcrete" mechanical placing is cited as means to speed work.
Concreting the Adams tunnel
Western Construction News
1946
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting begun on 13.05-mile Adams tunnel
Engineering Index Backfile | 1945
Engineering Index Backfile | 1931
|Concreting west Delaware tunnel
Engineering Index Backfile | 1960
|Concreting operations on Moffat water tunnel
Engineering Index Backfile | 1936
|Concreting a tunnel by compressed air
Engineering Index Backfile | 1913
|