Concreting begun on 13.05-mile Adams tunnel
Brief description of procedure and concreting equipment being used in lining Alva B Adams tunnel under Continental Divide.
Concreting begun on 13.05-mile Adams tunnel
Brief description of procedure and concreting equipment being used in lining Alva B Adams tunnel under Continental Divide.
Concreting begun on 13.05-mile Adams tunnel
Concrete
Concrete ; 53
1945
3 pages
Aufsatz (Zeitschrift)
Englisch