Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Regional Laboratory of Dept of Civil Engineering in Autun
Modular system of construction based on multiples of 1.20 m was used; building covers area of 980 sq m, with total volume of 3369 cu m; construction attempts to intergrate all that is known regarding quality and endurance of materials, ease of assembly, transformations and disassembly, comfort, and good design; building was ready for occupancy in 6 mo, including digging 40 sq m basement, brickwork, and all installations; construction of prefabricated modular wall and ceiling panels as well as assembly methods are described.
Construction of Regional Laboratory of Dept of Civil Engineering in Autun
Modular system of construction based on multiples of 1.20 m was used; building covers area of 980 sq m, with total volume of 3369 cu m; construction attempts to intergrate all that is known regarding quality and endurance of materials, ease of assembly, transformations and disassembly, comfort, and good design; building was ready for occupancy in 6 mo, including digging 40 sq m basement, brickwork, and all installations; construction of prefabricated modular wall and ceiling panels as well as assembly methods are described.
Construction of Regional Laboratory of Dept of Civil Engineering in Autun
Le batiment du Laboratoire regional des Ponts et Chaussees a Autun
Construction ; 18
1963
5 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Gislebertus, Meister von Autun
UB Braunschweig | 1962
|Architecture and Sculpture at Autun around the Millennium
British Library Conference Proceedings | 2003
|Die Bildhauerarbeit des XII. Jahrhunderts am Münster von Autun
UB Braunschweig | 1976
|