Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New method has been developed for construction of tall buildings, providing factory conditions for all men employed in erection, installation of engineering services, fitting and finishing; roof is constructed first at ground level in jig, then raised to 1-story height by hydraulic jacks to leave room for topmost floor to be constructed on same jig; process is repeated until entire structure has been completed and been lifted into its final position; permanent structure, construction techniques employed, and temporary jig as installed at ground level are described. (See also Instn Civ Engrs -- Proc v 27 Mar 1964 p 433-64)
New method has been developed for construction of tall buildings, providing factory conditions for all men employed in erection, installation of engineering services, fitting and finishing; roof is constructed first at ground level in jig, then raised to 1-story height by hydraulic jacks to leave room for topmost floor to be constructed on same jig; process is repeated until entire structure has been completed and been lifted into its final position; permanent structure, construction techniques employed, and temporary jig as installed at ground level are described. (See also Instn Civ Engrs -- Proc v 27 Mar 1964 p 433-64)
Jig for construction of 17-storey block of flats at barras heath, coventry
Arch Forum
Adler, F. (Autor:in)
Architectural Forum ; 120
1964
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Jig for construction of 17-storey block of flats at barras heath, coventry
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1948
Multi-storey flats-design, building methods and costs
TIBKAT | 1963
|Multi-storey flats-design, building methods and costs
Engineering Index Backfile | 1963
|