Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridging of firth of forth 1926-1964
Design summary for suspension bridge in Scotland, which was opened in Sept 1964; preliminary study was initiated in 1926, and site work was begun in 1958; main span is 3300 ft long and side spans are each 1340 ft in length; main towers rise to height of 512 ft. (see also Engineer v 218 n 5667 Sept 4 1964 p 358-63; Australasian Engr v 56 Oct 1963 p 44-6)
Bridging of firth of forth 1926-1964
Design summary for suspension bridge in Scotland, which was opened in Sept 1964; preliminary study was initiated in 1926, and site work was begun in 1958; main span is 3300 ft long and side spans are each 1340 ft in length; main towers rise to height of 512 ft. (see also Engineer v 218 n 5667 Sept 4 1964 p 358-63; Australasian Engr v 56 Oct 1963 p 44-6)
Bridging of firth of forth 1926-1964
Engineering
Engineering ; 198
1964
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridging of firth of forth 1926-1964
Engineering Index Backfile | 1963
Bridging of firth of forth 1926-1964
Engineering Index Backfile | 1964
Firth of forth hydraulic model
Engineering Index Backfile | 1966
|Engineering Index Backfile | 1964
|Engineering Index Backfile | 1957