Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Process, which is known as "cement bound road" produces almost perfect non-slippery road; particulars of experiment in Kirkcaldy district; sequence of operations; cost of such road as described varies from 3 to 4 shillings six pence.
Process, which is known as "cement bound road" produces almost perfect non-slippery road; particulars of experiment in Kirkcaldy district; sequence of operations; cost of such road as described varies from 3 to 4 shillings six pence.
Cement bound roads
Surveyor
Walker, A. (Autor:in)
1928
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1928
Engineering Index Backfile | 1930
|