A platform for research: civil engineering, architecture and urbanism
Process, which is known as "cement bound road" produces almost perfect non-slippery road; particulars of experiment in Kirkcaldy district; sequence of operations; cost of such road as described varies from 3 to 4 shillings six pence.
Process, which is known as "cement bound road" produces almost perfect non-slippery road; particulars of experiment in Kirkcaldy district; sequence of operations; cost of such road as described varies from 3 to 4 shillings six pence.
Cement bound roads
Surveyor
Walker, A. (author)
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1933
Engineering Index Backfile | 1928
Engineering Index Backfile | 1930
|