Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Problems of building thermal diffusion plant at Clinton Engineer Works in 75 days.
Thermal diffusion plant built rapidly
Eng News-Rec
Fox, M.C. (Autor:in)
Engineering News-Record ; 135
1945
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
Driven cylinder foundations built rapidly
Engineering Index Backfile | 1939
Fabricated building structure thermal insulation wallboard capable of being rapidly built
Europäisches Patentamt | 2023
|