A platform for research: civil engineering, architecture and urbanism
Problems of building thermal diffusion plant at Clinton Engineer Works in 75 days.
Thermal diffusion plant built rapidly
Eng News-Rec
Fox, M.C. (author)
Engineering News-Record ; 135
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
Driven cylinder foundations built rapidly
Engineering Index Backfile | 1939
Fabricated building structure thermal insulation wallboard capable of being rapidly built
European Patent Office | 2023
|