Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geologists drive tunnels and shafts into Sierra granite in preconstruction examination of bedrock underlying site of 354 ft earthfill flood control and irrigation structure on American River; main dam will be 11,500 ft long and excavation to total 21,000,000 cu yd.
Geologists drive tunnels and shafts into Sierra granite in preconstruction examination of bedrock underlying site of 354 ft earthfill flood control and irrigation structure on American River; main dam will be 11,500 ft long and excavation to total 21,000,000 cu yd.
Folsom dam foundation explorations
Western Construction News
Gorman, C.J. (Autor:in)
1945
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Faulted foundation complicates construction of Folsom dam
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1892
Engineering Index Backfile | 1891
Rock Scour Evaluation Folsom Dam Stilling Basin Folsom, Ca
British Library Conference Proceedings | 2007
|Engineering Index Backfile | 1951
|