Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Faulted foundation complicates construction of Folsom dam
Review of design and construction progress; flat dipping weathered zones were encountered in left abutment foundation area of concrete river section during construction of main dam; faults contained residual and ground water deposited clays, and in general dipped toward river 15° and slightly upstream.
Faulted foundation complicates construction of Folsom dam
Review of design and construction progress; flat dipping weathered zones were encountered in left abutment foundation area of concrete river section during construction of main dam; faults contained residual and ground water deposited clays, and in general dipped toward river 15° and slightly upstream.
Faulted foundation complicates construction of Folsom dam
Civ Eng (NY)
Kochis, F. (Autor:in) / Johnson, H.A. (Autor:in)
Civil Engineering ; 24
1954
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Folsom dam foundation explorations
Engineering Index Backfile | 1945
|Folsom dam construction in full stride
Engineering Index Backfile | 1954
|Rock Scour Evaluation Folsom Dam Stilling Basin Folsom, Ca
British Library Conference Proceedings | 2007
|Engineering Index Backfile | 1892
Engineering Index Backfile | 1891