Orkney causeway
Islands are tied up to Mainland by series of causeways nearly mile and half long and over 16 ft wide; work was undertaken to improve anchorage at Scapa Flow; 650,000 tons of rock were quarried and conveyed to causeway site; 325,000 tons of 5-ton and 10-ton concrete blocks were dumped at random to protect exposed faces of work; 3 1/2 miles of permanent new roads were built across islands.
Orkney causeway
Islands are tied up to Mainland by series of causeways nearly mile and half long and over 16 ft wide; work was undertaken to improve anchorage at Scapa Flow; 650,000 tons of rock were quarried and conveyed to causeway site; 325,000 tons of 5-ton and 10-ton concrete blocks were dumped at random to protect exposed faces of work; 3 1/2 miles of permanent new roads were built across islands.