Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Johore causeway
Causeway, which crosses Straits of Johore linking up Island of Singapore with mainland, is formed on rubble mound which is 3465 ft. in length; when completed it will carry two lines of railway and a roadway 26 ft. wide.
The Johore causeway
Causeway, which crosses Straits of Johore linking up Island of Singapore with mainland, is formed on rubble mound which is 3465 ft. in length; when completed it will carry two lines of railway and a roadway 26 ft. wide.
The Johore causeway
Engineer
Engineer ; 136
1923
2 pages
4 Figs. on supp. plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
Resurfacing old Macadam roads in Johore, Malaya
Engineering Index Backfile | 1928
|Resurfacing old Macadam roads in Johore, Malaya
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1909
|Engineering Index Backfile | 1912
|