Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of airfield designed for four runways, each 5000-ft long, with necessary taxiways; clearing and grubbing, grading, drainage, paving and seeding completed within 90-day contract time.
Philadelphia gets a new airport
Excavating Engr
Fox, L.M. (Autor:in)
Excavating Engineer ; 39
1945
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
On job at Philadelphia airport
Engineering Index Backfile | 1952
|Forecasts for Philadelphia international airport
Engineering Index Backfile | 1966
|Facility planning for Philadelphia international airport
Engineering Index Backfile | 1967
|Philadelphia conducts extensive subsurface exploration prior to airport expansion
Engineering Index Backfile | 1948
|