A platform for research: civil engineering, architecture and urbanism
Construction of airfield designed for four runways, each 5000-ft long, with necessary taxiways; clearing and grubbing, grading, drainage, paving and seeding completed within 90-day contract time.
Philadelphia gets a new airport
Excavating Engr
Fox, L.M. (author)
Excavating Engineer ; 39
1945
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Forecasts for Philadelphia international airport
Engineering Index Backfile | 1966
|On job at Philadelphia airport
Engineering Index Backfile | 1952
|Facility planning for Philadelphia international airport
Engineering Index Backfile | 1967
|Philadelphia conducts extensive subsurface exploration prior to airport expansion
Engineering Index Backfile | 1948
|