Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of 6-lane plate girder viaduct; crossing on soft meadows at New Jersey entrance to vehicular tunnel; details of pile foundations for viaduct spans; provisions for uneven settling of individual piers; details of bearings; features of circular ramp.
Design and construction of 6-lane plate girder viaduct; crossing on soft meadows at New Jersey entrance to vehicular tunnel; details of pile foundations for viaduct spans; provisions for uneven settling of individual piers; details of bearings; features of circular ramp.
Viaduct approach to Lincoln tunnel
Eng News-Rec
Dunham, C.W. (Autor:in)
Engineering News-Record ; 124
1940
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lincoln Builds First Heated Pedestrian Viaduct
Online Contents | 1994
|Engineering Index Backfile | 1938
|Viaduct construction method involving underlying tunnel protection
Europäisches Patentamt | 2024
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1937