A platform for research: civil engineering, architecture and urbanism
Design and construction of 6-lane plate girder viaduct; crossing on soft meadows at New Jersey entrance to vehicular tunnel; details of pile foundations for viaduct spans; provisions for uneven settling of individual piers; details of bearings; features of circular ramp.
Design and construction of 6-lane plate girder viaduct; crossing on soft meadows at New Jersey entrance to vehicular tunnel; details of pile foundations for viaduct spans; provisions for uneven settling of individual piers; details of bearings; features of circular ramp.
Viaduct approach to Lincoln tunnel
Eng News-Rec
Dunham, C.W. (author)
Engineering News-Record ; 124
1940
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lincoln Builds First Heated Pedestrian Viaduct
Online Contents | 1994
|Engineering Index Backfile | 1937
Viaduct construction method involving underlying tunnel protection
European Patent Office | 2024
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|