Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tough tunnel bows to chemical grouting
Difficulties experienced in driving 2.5 mi tunnel for Baltimore's $35 million Susquenhanna Water Supply Project; progress made by stabilizing soil and rock with chemicals.
Tough tunnel bows to chemical grouting
Difficulties experienced in driving 2.5 mi tunnel for Baltimore's $35 million Susquenhanna Water Supply Project; progress made by stabilizing soil and rock with chemicals.
Tough tunnel bows to chemical grouting
Eng News-Rec
Engineering News-Record ; 168
1962
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Green inorganic tough TBM (Tunnel Boring Machine) backfill grouting material and application thereof
Europäisches Patentamt | 2024
|British Library Online Contents | 2007
|British Library Online Contents | 2017
|British Library Online Contents | 2002
|