Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Spillway and stilling basin Columbia dam, Chattahoochee river Alabama and Georgia
Results of tests conducted on section models of gated and fixed-crest spillways; models were constructed to undistorted scales of 1;27.2 and 1;36, results demonstrated feasibility of eliminating energy-dissipating devices; pressure measurements on sill of spillway did not confirm unusual conditions dealt with in original design.
Spillway and stilling basin Columbia dam, Chattahoochee river Alabama and Georgia
Results of tests conducted on section models of gated and fixed-crest spillways; models were constructed to undistorted scales of 1;27.2 and 1;36, results demonstrated feasibility of eliminating energy-dissipating devices; pressure measurements on sill of spillway did not confirm unusual conditions dealt with in original design.
Spillway and stilling basin Columbia dam, Chattahoochee river Alabama and Georgia
U S Waterways Experiment Station -- Tech Report
Melsheimer, E.S. (Autor:in) / Murphy, T.E. (Autor:in)
1961
23 pages
26 Plates
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
|Navigation conditions, Columbia Lock and Dam, Chattahoochee River, Georgia and Alabama
Engineering Index Backfile | 1961
|