Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
1,600-ft. Sewer installed by horizontal boring
Sewer line in Houston, Tex was successfully installed by boring horizontal hole and pulling 18-in. concrete pipe into it; method of construction was to sink 4×16 ft shafts about 88 ft on centers along route of sewer; job done in record time; exfiltration leakage test carried out.
1,600-ft. Sewer installed by horizontal boring
Sewer line in Houston, Tex was successfully installed by boring horizontal hole and pulling 18-in. concrete pipe into it; method of construction was to sink 4×16 ft shafts about 88 ft on centers along route of sewer; job done in record time; exfiltration leakage test carried out.
1,600-ft. Sewer installed by horizontal boring
Civ Eng (NY)
Turner, G.M. (Autor:in) / Jones, F.T. (Autor:in)
1962
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Multi-Angle Horizontal Boring Machine for Boring Rock Bed and the Horizontal Boring Method Thereof
Europäisches Patentamt | 2021
|Horizontal auger boring projects
TIBKAT | 2017
|1,600 metres of reinforced concrete wall on the Lehmann system
Engineering Index Backfile | 1911
|Horizontal liner boring-machine
Engineering Index Backfile | 1914