Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Exacting conditions govern rock tunnel driving for Washington, D.C., sewers
Special equipment and methods used in construction of 11,000 lin ft of sewer tunnels in rock formation; blasting procedure; crossing of water tunnel; drilling and mucking; open-cut construction.
Exacting conditions govern rock tunnel driving for Washington, D.C., sewers
Special equipment and methods used in construction of 11,000 lin ft of sewer tunnels in rock formation; blasting procedure; crossing of water tunnel; drilling and mucking; open-cut construction.
Exacting conditions govern rock tunnel driving for Washington, D.C., sewers
Construction Methods
Construction Methods ; 22
1940
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1885
Engineering Index Backfile | 1891
UB Braunschweig | 2016
|TIBKAT | 2016
|Engineering Index Backfile | 1912
|