A platform for research: civil engineering, architecture and urbanism
Exacting conditions govern rock tunnel driving for Washington, D.C., sewers
Special equipment and methods used in construction of 11,000 lin ft of sewer tunnels in rock formation; blasting procedure; crossing of water tunnel; drilling and mucking; open-cut construction.
Exacting conditions govern rock tunnel driving for Washington, D.C., sewers
Special equipment and methods used in construction of 11,000 lin ft of sewer tunnels in rock formation; blasting procedure; crossing of water tunnel; drilling and mucking; open-cut construction.
Exacting conditions govern rock tunnel driving for Washington, D.C., sewers
Construction Methods
Construction Methods ; 22
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1885
Engineering Index Backfile | 1891
UB Braunschweig | 2016
|TIBKAT | 2016
|Engineering Index Backfile | 1912
|