Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Comparative discussion of costs and benefits of project considered as flood control project, as combined flood control and hydroelectric project and as flood control project with provisions for future installation of power generation facilities; indirect benefits; crop damage curve for Denison Dam and reservoir; results of power market study in Denison Dam area. From Texas Engr June 1941.
Comparative discussion of costs and benefits of project considered as flood control project, as combined flood control and hydroelectric project and as flood control project with provisions for future installation of power generation facilities; indirect benefits; crop damage curve for Denison Dam and reservoir; results of power market study in Denison Dam area. From Texas Engr June 1941.
Economic possibilities of Denison Dam
Civ Eng (NY)
Textor, G.E. (Autor:in)
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1944
TIBKAT | 2018
|TIBKAT | 1830
|