Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Waller-Denison track
Report on experiment in road surface construction; layer of broken stone was first rolled into turf, then layer of cement grout about 1/4 in. thick was spread; on this grout, while still wet, coir reinforcing mat was laid transversely, and on this, concrete mix 3/4 to 1 in. thick was spread; road has been tested for 3 mo period and, although this is not conclusive evidence, roads seems to show satisfactory wearing qualities. Before Instn Highway Engrs.
Waller-Denison track
Report on experiment in road surface construction; layer of broken stone was first rolled into turf, then layer of cement grout about 1/4 in. thick was spread; on this grout, while still wet, coir reinforcing mat was laid transversely, and on this, concrete mix 3/4 to 1 in. thick was spread; road has been tested for 3 mo period and, although this is not conclusive evidence, roads seems to show satisfactory wearing qualities. Before Instn Highway Engrs.
Waller-Denison track
Surveyor
1943
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1944
TIBKAT | 2018
|Economic possibilities of Denison Dam
Engineering Index Backfile | 1941
|TIBKAT | 1830
|