Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
H-piles in hollow-leg bents for bridge falsework
Double-deck highway and railway bridge over Piscataqua River at Portsmouth, NH, having total length of nearly 2800 ft, at location where swift tides and deep water made falsework erection difficult; solution was to set braced bents of hollow legs on bottom and drive steel H-piles through these legs to rock; piles averaged 100 ft in length; bridge loads were carried on bents and transferred to piles through bolted connection.
H-piles in hollow-leg bents for bridge falsework
Double-deck highway and railway bridge over Piscataqua River at Portsmouth, NH, having total length of nearly 2800 ft, at location where swift tides and deep water made falsework erection difficult; solution was to set braced bents of hollow legs on bottom and drive steel H-piles through these legs to rock; piles averaged 100 ft in length; bridge loads were carried on bents and transferred to piles through bolted connection.
H-piles in hollow-leg bents for bridge falsework
Eng News-Rec
Peirce, F. (Autor:in)
Engineering News-Record ; 126
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Effects of Pull-Over on Timber Bridge Falsework Piles
NTIS | 1987
|Bridge erected on rolling bents
Engineering Index Backfile | 1954
Ingenious bridge erection reduces falsework
Engineering Index Backfile | 1929
Two Toronto sewers built on piles and timber bents
Engineering Index Backfile | 1917
|Pushover Analysis of Bridge Intermediate Bents
British Library Conference Proceedings | 2003
|