Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ardnacrusha Hydroelectric Plant on Shannon River and Electrification of Ireland
Shannon River development having capacity of 90,000 kw.; construction of open weir, 14.5 m. high, intake, turbines, etc.; indoor and outdoor substations; plant can supply 153,000,000 kw-hr. annually in dry years and 37,000,000 kw-hr. in wet years; construction costs are 5,210,000 pounds sterling.
Ardnacrusha Hydroelectric Plant on Shannon River and Electrification of Ireland
Shannon River development having capacity of 90,000 kw.; construction of open weir, 14.5 m. high, intake, turbines, etc.; indoor and outdoor substations; plant can supply 153,000,000 kw-hr. annually in dry years and 37,000,000 kw-hr. in wet years; construction costs are 5,210,000 pounds sterling.
Ardnacrusha Hydroelectric Plant on Shannon River and Electrification of Ireland
L'usine hydroelectrique d'Ardnacrusha sur le Shannon et l'electrification de Irlande
Effertz, J. (Autor:in)
Genie Civil ; 95
1929
6 pages
20 Figs.
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydroelectric Power Plant on Shannon River in Ireland
Engineering Index Backfile | 1930
|Shannon Hydroelectric Development in Ireland
Engineering Index Backfile | 1929
|Ship locks at Shannon hydroelectric plant in Ireland
Engineering Index Backfile | 1930
|Construction of the shannon hydroelectric power plant
Engineering Index Backfile | 1928
|Model tests of flight of locks at shannon hydroelectric plant
Engineering Index Backfile | 1930
|