A platform for research: civil engineering, architecture and urbanism
Ardnacrusha Hydroelectric Plant on Shannon River and Electrification of Ireland
Shannon River development having capacity of 90,000 kw.; construction of open weir, 14.5 m. high, intake, turbines, etc.; indoor and outdoor substations; plant can supply 153,000,000 kw-hr. annually in dry years and 37,000,000 kw-hr. in wet years; construction costs are 5,210,000 pounds sterling.
Ardnacrusha Hydroelectric Plant on Shannon River and Electrification of Ireland
Shannon River development having capacity of 90,000 kw.; construction of open weir, 14.5 m. high, intake, turbines, etc.; indoor and outdoor substations; plant can supply 153,000,000 kw-hr. annually in dry years and 37,000,000 kw-hr. in wet years; construction costs are 5,210,000 pounds sterling.
Ardnacrusha Hydroelectric Plant on Shannon River and Electrification of Ireland
L'usine hydroelectrique d'Ardnacrusha sur le Shannon et l'electrification de Irlande
Effertz, J. (author)
Genie Civil ; 95
1929
6 pages
20 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydroelectric Power Plant on Shannon River in Ireland
Engineering Index Backfile | 1930
|Shannon Hydroelectric Development in Ireland
Engineering Index Backfile | 1929
|Ship locks at Shannon hydroelectric plant in Ireland
Engineering Index Backfile | 1930
|Construction of the shannon hydroelectric power plant
Engineering Index Backfile | 1928
|Model tests of flight of locks at shannon hydroelectric plant
Engineering Index Backfile | 1930
|