Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used in construction of railroad concrete-steel arch bridge, having span 130 m. long and rise of 31.8 m., over narrow canyon in Bavaria; falsework and steel erection; concrete work at abutments and progress of construction. (See also - nos. 1 Jan. 3, 1930, pp. 9-14)
Methods used in construction of railroad concrete-steel arch bridge, having span 130 m. long and rise of 31.8 m., over narrow canyon in Bavaria; falsework and steel erection; concrete work at abutments and progress of construction. (See also - nos. 1 Jan. 3, 1930, pp. 9-14)
Construction Plant Used in Erection of High Bridge over the Ammer at Echelsbach
Die Baustelleneinrichtung beim Bau der Hochbruecke ueber die Ammer bei Echelsbach
Duell, F. (Autor:in)
Bautechnik ; 8
1930
4 pages
25 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction Plant Used in Erection of High Bridge over the Ammer at Echelsbach
Engineering Index Backfile | 1930
|High Bridge over the Ammer at Echelsbach
Engineering Index Backfile | 1930
|High Bridge over the Ammer at Echelsbach
Engineering Index Backfile | 1930
|Arch bridge over the river Ammer near Echelsbach, Germany, and the construction-material question
Engineering Index Backfile | 1930
Engineering Index Backfile | 1930
|