Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cutoff-wall and rock grouting at the Milton reservoir embankment
Details of unique work in grouting rock beneath cutoff-wall in an earth embankment, Youngstown, Ohio. (1400 w.) (No. 59368)
Cutoff-wall and rock grouting at the Milton reservoir embankment
Details of unique work in grouting rock beneath cutoff-wall in an earth embankment, Youngstown, Ohio. (1400 w.) (No. 59368)
Cutoff-wall and rock grouting at the Milton reservoir embankment
Eng News
1915
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The successful grouting of Heapey embankment, Anglezarke reservoir
British Library Conference Proceedings | 2002
|British Library Conference Proceedings | 2008
|Foundation of cutoff wall of Angostura dam and methods of grouting of rock to ensure impermeability
Engineering Index Backfile | 1941
|Foundation cutoff wall -- Allegheny reservoir dam
Engineering Index Backfile | 1966
|