Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fast concreting on Brooklyn-Brighton viaduct, Cleveland
1700-ft. viaduct built in two longitudinal halves. (3000 w.) (No. 64111)
Fast concreting on Brooklyn-Brighton viaduct, Cleveland
1700-ft. viaduct built in two longitudinal halves. (3000 w.) (No. 64111)
Fast concreting on Brooklyn-Brighton viaduct, Cleveland
Eng News
1915
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of the Atlantic avenue improvement viaduct, Brooklyn
Engineering Index Backfile | 1903
Replacing the Cuyahoga Valley viaduct, Cleveland, Ohio
Engineering Index Backfile | 1909
Long concrete-arch viaduct built near Cleveland
Engineering Index Backfile | 1934
|The Brighton beach improvement of the Brooklyn Heights Railroad
Engineering Index Backfile | 1907
Improvement of the Brighton beach line -- Brooklyn heights railroad company
Engineering Index Backfile | 1907
|