A platform for research: civil engineering, architecture and urbanism
Fast concreting on Brooklyn-Brighton viaduct, Cleveland
1700-ft. viaduct built in two longitudinal halves. (3000 w.) (No. 64111)
Fast concreting on Brooklyn-Brighton viaduct, Cleveland
1700-ft. viaduct built in two longitudinal halves. (3000 w.) (No. 64111)
Fast concreting on Brooklyn-Brighton viaduct, Cleveland
Eng News
1915
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of the Atlantic avenue improvement viaduct, Brooklyn
Engineering Index Backfile | 1903
Replacing the Cuyahoga Valley viaduct, Cleveland, Ohio
Engineering Index Backfile | 1909
Long concrete-arch viaduct built near Cleveland
Engineering Index Backfile | 1934
|The Brighton beach improvement of the Brooklyn Heights Railroad
Engineering Index Backfile | 1907
Engineering Index Backfile | 1949
|