Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Wards island sewage treatment works ahead of schedule
Design features and method of construction of New York City's sewage disposal plant to cost $24,000,000; use of belt conveyors in placing 100,000 cu yd of concrete; shifting of movable forms on converted truck chassis; building of tank bottoms above tide level; Venturi meters; expansion joints; preliminary and final settling tanks; air diffuser plates.
Construction of Wards island sewage treatment works ahead of schedule
Design features and method of construction of New York City's sewage disposal plant to cost $24,000,000; use of belt conveyors in placing 100,000 cu yd of concrete; shifting of movable forms on converted truck chassis; building of tank bottoms above tide level; Venturi meters; expansion joints; preliminary and final settling tanks; air diffuser plates.
Construction of Wards island sewage treatment works ahead of schedule
Civ Eng (NY)
Gould, R.H. (Autor:in)
1933
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Belt concreting at Wards Island
Engineering Index Backfile | 1932
Hawaiian resort ahead of schedule
Online Contents | 2009
|Engineering Index Backfile | 1935
|Swansea Bay Sewage Treatment Works: structural design and construction
British Library Online Contents | 1998
|