Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods adopted by New Haven water company in waterproofing new reservoir
Method of construction of heavy concrete lining for Mill Rock distribution reservoir in New Haven, Conn; landscaping of reservoir site; construction of floor slabs and side walls; excavation material used in embankment; total cost $200,000.
Methods adopted by New Haven water company in waterproofing new reservoir
Method of construction of heavy concrete lining for Mill Rock distribution reservoir in New Haven, Conn; landscaping of reservoir site; construction of floor slabs and side walls; excavation material used in embankment; total cost $200,000.
Methods adopted by New Haven water company in waterproofing new reservoir
Water Works Eng
Minor, E.E. (Autor:in)
1933
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Wiley | 1925
|Waterproofing a leaky reservoir at Nashville
Engineering Index Backfile | 1922
|Waterproofing the new Ulm concrete reservoir
Engineering Index Backfile | 1910
Repairing and waterproofing concrete reservoir with gunite
Engineering Index Backfile | 1921
|