A platform for research: civil engineering, architecture and urbanism
Methods adopted by New Haven water company in waterproofing new reservoir
Method of construction of heavy concrete lining for Mill Rock distribution reservoir in New Haven, Conn; landscaping of reservoir site; construction of floor slabs and side walls; excavation material used in embankment; total cost $200,000.
Methods adopted by New Haven water company in waterproofing new reservoir
Method of construction of heavy concrete lining for Mill Rock distribution reservoir in New Haven, Conn; landscaping of reservoir site; construction of floor slabs and side walls; excavation material used in embankment; total cost $200,000.
Methods adopted by New Haven water company in waterproofing new reservoir
Water Works Eng
Minor, E.E. (author)
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wiley | 1925
|Waterproofing a leaky reservoir at Nashville
Engineering Index Backfile | 1922
|Waterproofing the new Ulm concrete reservoir
Engineering Index Backfile | 1910
Repairing and waterproofing concrete reservoir with gunite
Engineering Index Backfile | 1921
|