Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Jetting solidifies large embankment
Accelerating settlement of embankment at Cincinnati in filling in of Mill Creek Valley for new Cincinnati Union Terminal; analysis of fill materials; behavior of shale in fill; jetting was done with 2-in. pipe with 90° bend attached to standard 2 1/2-in. fire hose; cost, 2.3c per cu yd.
Jetting solidifies large embankment
Accelerating settlement of embankment at Cincinnati in filling in of Mill Creek Valley for new Cincinnati Union Terminal; analysis of fill materials; behavior of shale in fill; jetting was done with 2-in. pipe with 90° bend attached to standard 2 1/2-in. fire hose; cost, 2.3c per cu yd.
Jetting solidifies large embankment
Ry Age
Railway Age ; 94
1933
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Freezing solidifies tunnel shaft site
Engineering Index Backfile | 1962
|WOC '99 solidifies as global expo
British Library Online Contents | 1998
A composite construction material that solidifies in water
Tema Archiv | 1990
|LEADING DEVELOPMENTS - Norilsk Solidifies Position with Two Big Transactions
Online Contents | 2002
DOAJ | 2009
|