Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Use of freezing in construction of 25,000 ft tunnel between 2 boroughs of New York; system features 30 ft diam ring of freeze pipes surrounding 20 ft diam area that will be excavated to form tunnel shaft; after excavation is completed shaft will be lined with concrete; freezing is expected to take 60 days.
Use of freezing in construction of 25,000 ft tunnel between 2 boroughs of New York; system features 30 ft diam ring of freeze pipes surrounding 20 ft diam area that will be excavated to form tunnel shaft; after excavation is completed shaft will be lined with concrete; freezing is expected to take 60 days.
Freezing solidifies tunnel shaft site
Construction Methods Equipment
Smith, G.R. (Autor:in)
1962
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Jetting solidifies large embankment
Engineering Index Backfile | 1933
WOC '99 solidifies as global expo
British Library Online Contents | 1998
A composite construction material that solidifies in water
Tema Archiv | 1990
|LEADING DEVELOPMENTS - Norilsk Solidifies Position with Two Big Transactions
Online Contents | 2002
Engineering Index Backfile | 1951
|