Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of 8-mi section of oil-bound gravel highway 22-ft wide; drainage provided by corrugated culverts; cost data for culverts on Hoover Dam railroad.
Construction of 8-mi section of oil-bound gravel highway 22-ft wide; drainage provided by corrugated culverts; cost data for culverts on Hoover Dam railroad.
Hoover dam highway nears completion
Highway Mag
Buntin, W.H. (Autor:in)
Highway Magazine ; 24
1933
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Inter-American highway nears completion
Engineering Index Backfile | 1943
Red lodge-cooke highway nears completion
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1954
Limestone airbase nears completion
Engineering Index Backfile | 1949
Electrification Project Nears Completion
IuD Bahn | 1998
|