Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Completion of split-level intersection at Petit-Clamart cross-roads
Highway R.N. 186 bypassing Paris includes number of split-level intersections, study of which gives picture of evolution of ideas in this field; final layout of intersection examined is example of second generation intersection; work required construction of six overpasses and considerable amount of earthwork, access roadways, sanitation work, and lighting facilities; work had to be carried out with particular care on account of special onsite conditions; extensive geotechnical survey and use of critical path method were necessary.
Completion of split-level intersection at Petit-Clamart cross-roads
Highway R.N. 186 bypassing Paris includes number of split-level intersections, study of which gives picture of evolution of ideas in this field; final layout of intersection examined is example of second generation intersection; work required construction of six overpasses and considerable amount of earthwork, access roadways, sanitation work, and lighting facilities; work had to be carried out with particular care on account of special onsite conditions; extensive geotechnical survey and use of critical path method were necessary.
Completion of split-level intersection at Petit-Clamart cross-roads
L'amenagement definitif a niveaux separes du carrefour du Petit-Clamart
Lacaze, J.P. (Autor:in)
Construction ; 21
1966
9 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Study of Petit-Clamart intersection
Engineering Index Backfile | 1957
|Mission impossible - Clamart, France, arch. Fabienne Bulle.
Online Contents | 2000
Espace à lire : la Bibliothèque des enfants à Clamart
TIBKAT | 2006
|Intersection priority system [roads]
IEEE | 2002
|